With most, but not all, issues relating to the manufacture of the 30T now worked through with the factory, it will contain information directed specifically to those modellers who have pre-paid monies to Shrike Models.
Where possible, it will be posted as a document on Ixion letterhead so that its authenticity can be confirmed.
Lindsay O'Reilly
Director, Ixion Model Railways Australia Pty Ltd and Ixion Model Railways Ltd (UK).
No comments:
Post a Comment